III. Vision

Increase the supply rate of electricity from 9% to 32%;Construction of energy highways in the following lines 

  • Inga Site → Gabon → Cameroon → Nigeria → Mali
  • Inga Site → Central Africa → Chad → Libya
  • Inga Site → Angola → Namibia → Botswana → South Africa
  • Inga Site → South Africa → Sudan → Egypt
  • Inga Site → Malawi → Zambia → Zimbabwe → Lesotho

8 février 2019